- Introduce more flexible pricing to flatten the peak. Passengers would have greater financial incentives to travel during the ‘shoulders’ of the peak, or indeed off-peak, thereby making more efficient use of existing infrastructure and rolling stock.
- Phase out government subsidies and price controls so that fare levels better reflect industry costs.
- Convert first class carriages into standard class carriages to accommodate more passengers.
- Introduce high-capacity ‘economy class’ coaches with more standing room instead of seating (offering lower fare options).
- Lengthen trains by adding more carriages and extending platforms. Double-length trains could even be used on busier sections and then split part-way through the journey.
- Deploy improved signalling technology etc. to reduce the necessary gap between trains.
- Consider using double-decker trains where the engineering costs would not be prohibitive.
- Address bottlenecks by re-engineering junctions: relatively expensive but still much cheaper than building brand-new infrastructure.
- Divert freight onto quieter routes, enhancing loading gauges where necessary. For example, intermodal traffic from Felixstowe to the Midlands and North can be sent via the Ipswich-Nuneaton route rather than the southern West Coast Main Line.
- Allow full vertical integration to end the artificial separation between track and train, and between different franchisees and open-access operators. This would improve the financial incentives to make more efficient use of spare capacity.